Web-Based Network Management Software for utilities
Access your utility network data both online and offline
Capture your utility network infrastructure with the highest data quality
Simulate network effects and plan your utility infrastructure
Provide buried utility network infrastructure maps and manage locates requests
Organize maintenance tasks for equipment to ensure operational safety
Keep your GIS and SAP perfectly in sync
Build and configure powerful Online GIS applications without writing a line of code
Empower your ArcGIS with granular access permissions
Build better applications based on near real-time data analysis
Do more by integrating Toolkit, Workflow, Printing and Reporting into ArcGIS Pro
Transform your linear referenced data into dynamic charts
Streamline ArcGIS item management with powerful tools
Sophisticated mobile GIS applications to empower your field workers, even when offline
Create high-resolution map outputs with flexible print templates
Deliver key information to the right people with configurable GIS reports
Deliver cutting-edge Web GIS applications
Build powerful GIS workflows that solve complex business challenges
Empowering efficient, data-driven facility and asset management
Property Management Software for Ultimate Transparency and Control
Smart Energy Management Software: Reduce Energy Consumption. Maximize Control.
Green Space Management and Tree Inventory Software for optimal Maintenance, Safety, and Compliance
CMMS Software for Optimal Performance, Safety, and Compliance
Simplify property and real estate management for smarter decisions
Full-stack network inventory software for telecom operators
Model all layers of your telecommunications network with VertiGIS ConnectMaster
View all network assets at the click of a button with ConnectMaster
Seamless view across all network layers with ConnectMaster
Process-oriented, automated network planning with ConnectMaster
Enhance network operations with ConnectMaster’s efficiency tools
Access your network data from anywhere with ConnectMaster
Integrate OSS and BSS with ConnectMaster
Software for telecommunications network operators
Streamline access to unified network information
Unified fiber and copper network design and management
Collaborate, integrate, and visualize
Comprehensive Fiber/Copper Network Lifecycle
Fri, 15 Jul 2016

Tabulation of All RUS Units in One Place: Vendor Shortcomings

Tabulation

 

The following two-part blog was contributed by Tom Vick, ­­­Director of Engineering at Pioneer Communications. Pioneer Communications has been a Mapcom Systems customer for four years. In part one of this series, Tom discusses the company’s struggle to find a vendor to meet the day-to-day needs of Pioneer Communications’ operations in regard to RUS Unit tabulation.

 

Electronic maps have been around for many years. The ability to electronically draw and maintain paperless records of outside plant has been available to the industry for, generally, more than 35 years.

 

In about 1996, our mapping vendor (at that time) migrated to a GIS solution, and decided to use Oracle for the database piece of the software. This allowed the team to maintain more accurate OSP records, especially as to where facilities were actually located in the real world. While moving to a GIS solution was good, we were still unable to establish an easy or efficient method to tabulate all RUS-type units in the Oracle database, based on the tables being used at that time. There was no impetus, on the part of the vendor, to provide any solution to this issue (among other issues, such as interconnection to our billing software). To be fair, there was no impetus internally, here at Pioneer, to migrate to a construction sheet or unit tabulation process within the mapping software. We were able to draw construction sheets, but not being able to tabulate the units caused us to maintain the process of manually drawing the sheets, and having a separate process for tabulating the units.

 

Any RUS borrower, or former borrower, understands the complexity of staking and tabulating RUS-type Unit Designations. Our method of tabulating in Access included a table called Units, where we maintained every possible RUS Unit Designation, so that we had some reasonable amount of validation when tabulating units for a given project (the unit designation we entered in the Project Tabulation table had to exist in the Units table). We recently evaluated our Access table called Units and found that we had 1,900 records in that table. Many of these records had to do with dual facilities (i.e., [BFC25-24 & BFO24]D, etc.), and we modified our tabulation of D type construction units, such that we were able to eliminate these dual Unit Designations, getting us down to around 1,800 records in this Units table. That still left a lot of Unit Designations to maintain. Many of these were BM -type units, PM-type units, W-type units and XX -type units, etc., and there will always be a need to express and tabulate those types of Units, using RUS Unit Designations.

 

To read more on the solution to Pioneer Communications’ dilemma, come back for part two of Tom’s blog next week.